The CJ Gonjiam Mega-Hub DMS System
페이지 정보
본문
Background
The project was launched to improve the operational efficiency of the Gonjiam Mega-Hub in the metropolitan area, establish standard processes to ensure delivery flow, such as loading and unloading and dispatching of trunk vehicles, and establish integrated logistics control.
Details
With the implementation and application of Gonjiam Mega-Hub DMS, the dock assignment of trunk vehicles and vehicles, which plays an important role in the logistics flow in the local and metropolitan areas, proceeded smoothly, and is currently in operation in all eight hubs.